Timeline¶
You can switch and select the model data for measurement and comparison through the timeline.
There can be up to 10 sets of model data on the timeline, and you can select up to 2 sets of model data:
- One model data can be selected on the timeline in the benchmarks function and planning function.
- One or two sets of model data can be selected on the timeline in the measurement function.
- Two sets of model data need be selected on the timeline in the comparison function.
Operation | Description |
---|---|
Switch to another model | Drag the cursor |
Select/Unselect the model | Click the node |
Delete the model (plan) | Click |
Caution
- If there is only one model exists, the timeline is not displayed.
- If the imported model has no/less feature points, it cannot be selected, or switched to it from another model on the timeline (except the benchmark function).